Choose an Organic Waste Treatment System

Compare the Yes-Sun equipment range by feedstock, project scale and complete process requirements.

Request Model Selection Help

Discuss distribution opportunities

Download the English equipment selection guide (PDF)
Published reference values for initial planning; confirm current specifications for your project.

Compare the equipment range

These are published reference figures for initial comparison. Actual throughput and process time depend on the feedstock, moisture, bulk density, drying conditions, configuration and operating schedule. We confirm the current project specification before quotation.

Volume figures in litres cannot be converted to kilograms without the material’s bulk density. Share wet weight per day and moisture information, if available.

Published reference values for initial equipment selection
ModelTypical projectBatch volumeDaily volume referenceReaction stageAdditional drying
DIY-150LSmaller on-site projects, farms, parks and schools120–150 LConfirm operating schedule90 min4–6 h
COM-400LFood-service, community and smaller commercial projects280–320 L1,000–2,000 L90 min4–12 h
COM-1000LLarger institutional and commercial facilities800 L3,000 L90 min6–12 h
SUN-1500LIndustrial facilities and larger integrated processing lines1,400 L5,000 L90 minAt least 8 h
ECO-6000LLarger projects handling dry, solid crop residuesConfirm current batch specification20,000 L reference90 minAt least 8 h

See the models and published specifications

Use these starting points to discuss the current configuration, utilities and installation requirements.

Yes-Sun DIY-150L organic waste treatment equipment

DIY-150L

Smaller on-site projects, farms, parks and schools. Suitable material: suitable organic materials, assessed for the project.

Utilities: Three-phase 220/380 V; 800 W electrical reference, plus gas 1.2 kg/h.
Published dimensions: 85 × 140 × 150 cm.

View model information and demonstrations →

Discuss DIY-150L
Yes-Sun COM-400L organic waste treatment equipment

COM-400L

Food-service, community and smaller commercial projects. Suitable material: food waste and suitable manure mixtures.

Utilities: Three-phase 220/380 V; 12.5 kW reference; electricity or factory steam.
Published dimensions: 130 × 130 × 230 cm.

View model information and demonstrations →

Discuss COM-400L
Yes-Sun COM-1000L organic waste treatment equipment

COM-1000L

Larger institutional and commercial facilities. Suitable material: food waste and suitable manure mixtures.

Utilities: Three-phase 220/380 V; 30 kW reference including heating; electricity or factory steam.
Published dimensions: 300 × 200 × 250 cm.

View model information and demonstrations →

Discuss COM-1000L
Yes-Sun SUN-1500L organic waste treatment equipment

SUN-1500L

Industrial facilities and larger integrated processing lines. Suitable material: agricultural or industrial organic materials, assessed for the project.

Utilities: Project-specific; steam, electric heating or boiler options.
Published dimensions: Project-specific layout.

View model information and demonstrations →

Discuss SUN-1500L
Yes-Sun ECO-6000L organic waste treatment equipment

ECO-6000L

Larger projects handling dry, solid crop residues. Suitable material: dry agricultural residues.

Utilities: Project-specific; steam, electric heating or boiler options.
Published dimensions: Project-specific layout.

View model information and demonstrations →

Discuss ECO-6000L

Plan for the full process

Reaction time is one stage of the process. The published 90-minute reaction stage is followed by drying where required. For example, COM-400L lists an additional 4–12 hours of drying. Preparation, handling and output checks also form part of the project workflow.

Our technical discussion covers preparation, reaction, drying, handling and the intended output. Available configurations, heat sources and operating conditions are confirmed for the proposed site.

Prepare your enquiry

  • Country and site type
  • Material or material mixture
  • Estimated kilograms or tonnes per day
  • Moisture and bulk density, if known
  • Available electricity or heat source
  • Intended output and installation constraints

Discuss the right configuration

Send your project details to the international business team. We will review the information and discuss the model and process requirements.

Start an Equipment Enquiry

Distribution enquiries: Become a Yes-Sun distributor · Email: compostingfree@gmail.com