Start with your feedstock and project

Choose an on-site system or an integrated processing line based on the material you need to treat and the operating conditions at your location.

  • Food waste: discuss collection, preparation, moisture and the planned daily volume.
  • Livestock manure: discuss the material mixture, moisture adjustment and intended output.
  • Agricultural residues: discuss particle size, moisture and the complete processing line.
Compare Equipment

For overseas projects and partners

We welcome enquiries from equipment buyers, project developers, technical integrators and potential distributors.

Tell us your country, application and support requirements so we can discuss the appropriate next step.

Explore distribution cooperation →

Explore the equipment range

Compare published capacities and the complete process before selecting a model.

Yes-Sun DIY-150L organic waste treatment equipment

DIY-150L

A smaller on-site option with a published batch reference of 120–150 L.

View Model Comparison
Yes-Sun COM-400L commercial organic waste treatment equipment

Commercial systems

COM-400L and COM-1000L for food-service, community and institutional applications.

Compare Commercial Models
Yes-Sun SUN-1500L industrial organic waste treatment equipment

Industrial systems

SUN-1500L and ECO-6000L for larger or integrated material-processing projects.

Explore Industrial Options

Understand the complete treatment process

Reaction time is one stage of the process. The published 90-minute reaction stage is followed by drying where required. For example, COM-400L lists an additional 4–12 hours of drying. Preparation, handling and output checks also form part of the project workflow.

1. Assess and prepare

Check the material, moisture, particle size and any preparation or mixing requirements.

2. Run the reaction stage

Use the selected equipment and process formulation according to the agreed specification.

3. Complete drying and handling

Plan the additional drying time, utilities and material handling for the application.

4. Confirm the intended output

Discuss the required product information, testing and suitability for the intended application.

Develop your local market with Yes-Sun

For potential distributors and technical partners, start a discussion about your market, customer base and local service capabilities. Product availability, support requirements and commercial terms are reviewed for each proposed cooperation.

Discuss Distribution

Prepare for a technical discussion

Bring your material type, estimated daily quantity, country and intended use. Existing project data helps us review configuration and installation requirements.

Download the English equipment selection guide (PDF)
Published reference values for initial planning; confirm current specifications for your project.

Tell us about your project

Start an equipment enquiry or contact the international business team at compostingfree@gmail.com.

Request a Technical Assessment

Company history and published milestones · Company contact details